Alban Way temporary closure 11th Feb for 3 weeks - REOPENED 3rd March

ALBAN WAY REOPENED ON MARCH 3RD - ON TIME

So the rest of this post is redundant.

Information from Debbi White, Assistant Estates Surveyor, St Albans City and District Council, Tel: 01727 819515 - summary of her letter.

Alban Way will be closed between Camp Road and Orient Way from 11th February for about three weeks (depending on the weather).

This is to allow for works to take place in connection with the Linden Homes & City Station development to provide mains drainage

BUT NOT YET (as previously stated) the (good news) cycling & pedestrian ramp from the site to the Alban Way, giving off-road access to the station.

SADC, appreciating the importance and popularity of the route, had hoped to keep the Alban Way open during the works, but for justifiable safety concerns (a 3.5 metre deep trench is required) closure was the only option.

The work will include re-surfacing affected areas.

Formal notices will appear in the local press and closure notices are erected at Dellfield and Orient Close.

The footpath from Dellfield to Vanda Crescent will remain open

Diversions will be posted.

[[ End of Debbi's Info ]]

Additional info from me....

The first week of closure falls in half term, so the impact will be reduced somewhat.

A number of local school have been notified, STACC have been asked to identify any others which we feel should be notified.

Diversions

Diversion notices in the form of maps are posted at each end of the affected section.

There are no directions posted along the line of the diversion route (only motorists get those), so I have prepared route sheets of my own suggested diversions (below). Please advise any errors to me by way of a comment to this post.

You can print clips from these to take with you if you are not familiar with the area.

Two routes are suggested, one almost entirely on-road & faster, for experienced riders, the other entirely a combination of off-road and quiet roads.

There is a different route sheet for each direction.

Alban Way closure 11 Feb 08

Diversion for EASTBOUND users - ON-ROAD Option

(Traffic conditions could be heavy in some roads at some times, especially around City Station.)

Halfway along Orient Close, instead of going straight ahead, turn left - up slope (also Orient Close)

At Roundabout (London Road Junction) go forward into Grosvenor Rd.

(Option use nearby pelican crossing).

Follow up hill to junction with Ridgmont Rd.

Turn right into Ridgmont Rd.

Go through line of bollards, bearing left (still Ridgmont Rd).

At end turn right into Victoria St. (often busy).

Over railway bridge, forward at traffic lights.

At next junction, main road bears left, go forward into Grimston Rd.

Turn left into Flora Grove.

At fork, bear right to continue in Flora Grove.

Down hill and turn left into Vanda Crescent.

Just before school, take footpath on right (walk).

At end rejoin Alban Way - turning left to cross bridge.

Alban Way closure 11 Feb 08

Diversion for WESTBOUND users - ON-ROAD Option

(Traffic conditions could be heavy in some roads at some times, especially around City Station.)

After bridge over Camp Rd. take footpath on right, beyond school (walk).

At end, turn left (Vanda Crescent).

At end turn right (Flora Grove).

Bear left at junction & follow to tee junction,

where turn right (Grimston Rd.)

At junction with Stanhope Rd, go forward & again forward through traffic lights.

After railway bridge, but before traffic lights, turn left (Ridgmont Rd.)

Forward for 200 metres then right through line of bollards (still Ridgmont Rd)

At junction with Grosvenor Rd, turn left into Grosvenor Rd.

At roundabout (London Rd junction) go forward into Orient Close.

(Option use nearby pelican crossing).

Down incline then turn right to rejoin Alban Way.

Alban Way closure 11 Feb 08

Diversion for EASTBOUND users - OFF-ROAD/QUIET ROAD Option

(Traffic conditions should be very quiet on this route, suitable for children.)

Halfway along Orient Close, instead of going straight ahead, turn left - up slope (also Orient Close), using cycle path.

At junction with London Rd, use pelican crossing to cross London Rd (walk).

Go right & cross Grosvenor Rd, to join cycle path alongside London Rd.

Pass under railway bridge & cross two side roads.

At Cunningham Hill Rd, turn left.

This is a quiet cul-de-sac, so ride on road.

As Cunningham Hill Rd bears right, go left into Barncroft Way.

After 50 metres go through gap with three bollards on right.

Using footway (walk) bear left & go through four bollards.

Still keeping left follow footway and continue alongside Parkview Close.

Continue on footpath alongside playing field, through barriers & down hill.

At Dellfield turn right then take path on left just before junction with Camp Rd.

Up slope to rejoin Alban Way, turn right to cross bridge.

Alban Way closure 11 Feb 08

Diversion for WESTBOUND users - OFF-ROAD/QUIET ROAD Option

(Traffic conditions should be very quiet on this route, suitable for children.)

After bridge over Camp Rd. turn left, down slope to Dellfield.

Turn right then after Hawkshill take footpath on left, up hill (walk).

Through barriers and alongside playing field, continue on footway alongside Cell Barnes Lane.

Bear right between four bollards, then through gap with three bollards.

To join Barncroft Way, turning left.

After 50 metres go right into Cunningham Hill Rd.

This is a quiet cul-de-sac, so ride on road.

Just before end (junction with London Rd) go right on shared cycle path.

Cross two side roads & go under railway, continue to Grosvenor Rd.

Cross Grosvenor Rd & take pelican crossing over London Rd (walk).

Join cycle path in Orient Close, go down slope to tee junction.

Turn right to rejoin Alban Way.

Post updated 4th March with reopening info.

Post updated 31 Jan due to fault in Blogger, which resulted in route sheet headings being rendered with font-size of zero!

Post updated 8 Feb due to the closure start date being brought forward (or incorrectly advised) - It is now Feb 11th, not 12th. Plus other detail changes.

25 May 2007

STACC Welcomes St Albans Mayor in Bike Week

St Albans Mayor, Councillor Kate Morris, is expected to join us for the 6 mile Family Ride along the Alban Way on Thursday 21st June.

The event starts at 6:30 pm.
Finalised Venue for the Start & Finish is Earthworks, Hixberry Lane.
(Venue was originally the Highfield Centre, Hill End Lane, next to SPAR, but in view of the Mayor's visit we have changed it to Earthworks. We will be looking out for people who arrive at Highfield Centre and redirecting them)

We hope that there will be a good turn-out of STACC members to welcome the Mayor in style.

Success of the Cycle Campaign depends so much on good impressions made to the District Council and encouragement to the folks of St Albans who will see reports and photographs of the event in the local press.

4 May 2007

STACC Councillor

Our long-standing committee member Jack Pia was elected councillor for St Peters Ward in yesterdays elections - Congratulations Jack!

3 May 2007

London Road Cycle Path

What is it?
London Road Cycle Route will run off-road from Grosvenor Road to St Vincent Drive, making use of the wide footway (which is currently only used for car parking).
It will continue on-road on (quiet) Admiral's Walk to connect with the existing cycle path which continues to London Colney.
The design provides safe crossing places at junctions.
It will be a very significant addition to our modest cycling infrastructure as it will provide a continuous route from London Colney and London Road
estates to a very useful junction from which journeys can continue off-road along Alban Way or on quieter roads (Old London Road, Approach Road/Riverside Road) and the 30 mph section of London Road into town.
It avoids the need to use the 40mph(+++) section with central refuges which are too daunting for inexperienced cyclists.
Importantly it will make possible many safe cycle journeys to schools and to the City Station.

When?
According to the Highways Partnership meeting of October 24th 2006, work would start about January 2007. - Not achieved.
So Wheeeen???
According to St Albans Cycling Strategy meeting on 16th April 2007, the work would most definitely start that very week. - Not achieved.
So Whe.e.e.e.e.e.nnnn ?????
According to STACC member Ollie's careful scrutiny, looking (on 2nd May 2007) for the smallest indication that something has started......
"There's no sign of any activity on this - not even a road cone! I thought Herts Highways were supposed to start as soon as the works in the High Street were finished. "
But see comments .......



13 Mar 2007

St Albans Cycle Strategy - get involved

You can make the city and district a better place to cycle! Have a look at the draft cycle strategy, it is on the St Albans District Council website, the first item (bravo!) on the transport tab. Then fire off lots of constructive feedback, it will help move cycling up the political agenda if this generates a big response. Get on with it though, as comments are sought by Friday 16 March.

Click here to see the strategy document.